Project:
Harmony Health Plan of Illinois (HMO)
Chicago, IL/ St. Louis
Upgraded 90% of company's PCs to current level hardware and
software (70 PCs).ÝPC Upgrades included:
- Hardware (70 PCs)
- Upgrading hard drives
- Upgrading processors to Pentium technology
- Upgrading memory levels
- Software (70 PCs)
- Upgraded Operating System to MS Windows 98
- Upgraded MS Office
- Installed MCAFEE Virus Scan
- Re-established Network connectivity (70 PCs)
- Re-installed and configured network interface Cards
- Installed and configured Netware Client
- Configured network ProtocolsÝ (Netware/IPX & TCP/IP)
- Connection to corporate Gateway
- Connection to Corporate Mainframe via Reflections HP Terminal Emulation
- Re-established connection to network printers
- Provide on-going hardware and software service maintenance for all networked PCs
|